China
THIEMT plans new chemical-technical laboratories for the plants of Twin Tigers Coatings in Wuhan and Jinan and develops a new laboratory organization following German standards.
Belgium
Firmenich, an international producer of flavours and scents gets a custom-made sensory laboratory for the production plant in Belgium.
Germany
THIEMT assumes the construction supervision of the laboratory and the clean room for the research building ZGH of the Ruhr-University Bochum.
Germany
THIEMT plans and builds a laboratory container with standard climate conditions for the quality control of sewing threads and yarns.
Germany
THIEMT, as main contractor, receives the contract for the planning and construction of a highly installed pharmaceutical laboratory building made of module design elements.
Germany
With the new research buildings IA/
Germany
New laboratories for Ashland in Düsseldorf: THIEMT plans and builds all subsections (ventilation and air conditioning, electrical engineering) and the laboratory furniture of the new laboratories for Ashland.
Germany
As main contractor THIEMT plans and designs a turnkey S2-laboratory building of about 400 m2, made of container elements, for the new ifp-location in Ohrdruf near Gotha.
Scotland
SRUC in Edinburgh gets a completely mobile laboratory on a trailer, planned and designed by THIEMT.
Germany
DyStar needs new laboratory space: THIEMT issues a project study and as a result presents several alternatives – reconstruction, new construction and laboratory container.